Improvement of existing KC CCS technology
- Design improvement of primary and secondary membrane system
- Development of new insulation system and upgrading of design to improve BOR
- Improvement of price competitiveness and quality of material
- Development of enhanced manufacturing methodology
Expected Benefits
- Improvement of quality level and competitiveness through upgrading of existing design
- Productivity improvement and cost saving through automation of construction process
- Increase of global market share of LNG carrier through quality and cost competitiveness improvement
Development of technology for inspection and repairing
- Creation and revision of LNG carrier material inspection procedure
- Development of measuring instrument for inspection of LNG carrier
- Creation and revision of quality guidance and repair procedure for the CCS and CHS of LNG carrier
-
Temperature Distribution of Insulation Panel
-
Sloshing Test of KC-2 CCS with 174,000 m³ Cargo Volume